Our friends at Raider Contracting hired DDS to demolish this rotting wood deck and outdated brick flowerbed. This job consisted of removing the deck piece by piece along with the supports underneath the deck. The next step for our team was to break down and remove each piece of brick. In addition, to accommodate the specs of the modern design, we removed 4 concrete steps. Throughout this job the team did their best to keep debris from falling into the pool and the jobsite as clean as possible.